Project Description:
Ground Up Construction of 90,00 Square Foot Structural Steel Building with Brick Skin on an active military Naval Air Station immediately following 9-11-01

Problem/Challenge:

  • Proposed site elevations conflicted with existing infrastructure invert of the base and would not have allowed the site to drain properly
  • Existing site utility drawing errors of up to twenty feet
  • Elevated security level immediately following 9-11-01
  • Extremely aggressive completion schedule
  • Required to maintain all base roads debris-free during all weather conditions

Corrective Action

  • Created a topographical graph and supporting documentation of existing canals, drainage ditches, and water flow allowing for redesign of site plan in order to correct proposed site elevation errors
  • Utilized a water jet to cut 8' x 32' trenches every 20' to 30' in order to properly identify existing site utilities and fiber optic cable
  • Created a custom employee, subcontractor, and supplier database which the military base utilized extensively to monitor all construction activities
  • Utilized multiple shifts and a seven day per week working schedule. Effective management of all subtrades.
  • Constructed and maintained a custom- made Wash-Off/Containment Station to effectively control debris