Belle Chasse Academy
| For additional information regarding this project, click here. |
Project Description:
Ground Up Construction of 90,00 Square Foot Structural Steel Building with Brick Skin on an active military Naval Air Station immediately following 9-11-01
Problem/Challenge:
- Proposed site elevations conflicted with existing infrastructure invert of the base and would not have allowed the site to drain properly
- Existing site utility drawing errors of up to twenty feet
- Elevated security level immediately following 9-11-01
- Extremely aggressive completion schedule
- Required to maintain all base roads debris-free during all weather conditions
Corrective Action
- Created a topographical graph and supporting documentation of existing canals, drainage ditches, and water flow allowing for redesign of site plan in order to correct proposed site elevation errors
- Utilized a water jet to cut 8' x 32' trenches every 20' to 30' in order to properly identify existing site utilities and fiber optic cable
- Created a custom employee, subcontractor, and supplier database which the military base utilized extensively to monitor all construction activities
- Utilized multiple shifts and a seven day per week working schedule. Effective management of all subtrades.
- Constructed and maintained a custom- made Wash-Off/Containment Station to effectively control debris





|