Corporate Interiors
- Baker Donelson Tenant Improvements & Renovations
- Place St. Charles Elevator Lobby and Garage Renovations
- Ernest N. Morial Convention Center Phase I Lobby Renovations
- American Red Cross
- ABF Freight Lines — Renovation
- Center For Energy Resources Management
- Entergy-Mobil Building Interior Renovations
- Shell Oil Company Tenant Improvements at One Shell Square
- Louisiana Medical Mutual Insurance Company
- Capital One Bank Tenant Build-Out at Place St. Charles
- Capital One Bank Renovations
View All Corporate Interiors
Education
- Tulane University Weinmann Hall Roof Replacement and Waterproofing
- St. Augustine High School Expansion and Renovations
- Tulane University Medical Center – Central Plant Upgrade
- Tulane University – Building 107 Repairs
- Xavier University – Interior & Exterior Renovations
- Xavier College of Pharmacy Suite Renovation
- Loyola University Orleans Room
- LSU Health Sciences Center – Medical Education Building
- LSU Health Sciences Center — Charity School of Nursing Dormitory
- Belle Chasse Academy
- Archbishop Hannan High School
- Lakeshore High School
- LSU School of Medicine Center For Advanced Practice
View All Education
Federal Government/Military
- Storm Proofing with Generator at Pumping Station No. 13
- Cryogenic Control Center & Safe Haven for LOX/LH2 Barges – Stennis Space Center
- Gillis Long Center, Buildings 11 & 27
- Belle Chasse Academy
View All Federal Government/Military
Health Care
- Tulane University Hospital & Clinic Surgical Suite Corridor Renovations
- Tulane University Medical Center – Central Plant Upgrade
- Tulane University Hospital and Clinic – Administrative Office Renovations
- East Jefferson Hospital Oxygen Tank Relocation
- Mary Bird Perkins Cancer Center at Terrebonne General Medical Center
- C&M Medical Services Building
- Chalmette Medical Center MRI Recolaction
- LSU School of Medicine Center For Advanced Practice
- University Hospital Renovations Package “E,” LSU Health Sciences Center
- Chalmette Medical Center Expansion/Intensive Care Unit
- Louisiana Medical Center & Heart Hospital Addition & Renovations
View All Health Care
Hospitality
- Sheraton Hotel Door Replacement
- New Orleans Marriott 2nd, 4th, and 5th Floors
- Omni Crescent Hotel Restoration
- Fairmont Hotel Exterior Stair Tower Replacement
- Omni Royal Orleans Men & Women’s Pool Restroom Renovations
- Omni Royal Orleans Lobby and Rib Room Renovations
- New Orleans Marriott Sliding Glass Door Replacement and Repairs
- New Orleans Marriott Health Spa
- New Orleans Marriott Lobby and Ballroom Renovations
View All Hospitality
Industrial
- Riverfront Cold Storage Facility at The Port of New Orleans
- Folgers Coffee Company Interior Floor Leveling
- Folgers Coffee Company Exterior Door Replacement
- Shell Oil Company – MetOcean Training Facility
View All Industrial
Office Facilities
Recreation & Entertainment
Residential
- Nazareth Inn II Improvements
- Cabrini Luxury Apartments
- New Desire Phase I B
- Sugar Plantation Condominiums
View All Residential
Retail
- Clearview Mall 3rd and 4th Floor Renovations
- Starbucks, Ernest N. Morial Convention Center
- A-1 Appliance
- The Mattress Firm
- Lamarque Jeep-Chrysler-Dodge
- Café Du Monde, Metairie, LA
- Bed Bath & Beyond, Clearview Mall
View All Retail
Specialty
- Riverfront Cold Storage Facility at The Port of New Orleans
- Cryogenic Control Center & Safe Haven for LOX/LH2 Barges – Stennis Space Center
- Shell Oil Company – MetOcean Training Facility
- Riverwalk Elevator Replacement
- GNO Expressway Commission High Voltage Aerial Cable Installation Consultants
View All Specialty
Storm Restoration
- Capital One Bank Civic Center
- New Orleans Marriott Restoration
- Davis Saunders Building Roof Replacement
- Omni Royal Orleans Room Restoration and Renovation
- Omni Crescent Hotel Restoration
- Oakwood Mall
- Cadillac of Metairie
- Holiday Inn Select
- Marriott Residence Inn
- Marriott Springhill Suites
- Clearview Mall
- Clearview Mall
- St. Augustine High School Demolition and Restoration
- Capital One Bank Civic Center
- New Orleans Marriott Restoration
View All Storm Restoration
Under Construction
- Riverfront Cold Storage Facility at The Port of New Orleans
- Tulane University Weinmann Hall Roof Replacement and Waterproofing
- Storm Proofing with Generator at Pumping Station No. 13
- Baker Donelson Tenant Improvements & Renovations
- Sheraton Hotel Door Replacement
- St. Margaret’s Daughters Home Renovations
- Tulane University Hospital & Clinic Surgical Suite Corridor Renovations
- Louis Armstrong New Orleans International Airport – Concourse D Expansion
- Mary Bird Perkins Cancer Center at Terrebonne General Medical Center
- Mary Bird Perkins Cancer Center at Terrebonne General Medical Center
View All Under Construction
Bed Bath & Beyond, Clearview Mall
When the owner of Clearview Mall approached The McDonnel Group about negotiating this project they were under the assumption that the project may not come to fruition due to constructability issues. Engineers had advised them that a second floor could not be added. We immediately worked on non-conventional approaches to the structure. As a result, the owner changed his intent of performing the project on a third party general contractor approach to a design-build scenario. The McDonnel Group, in turn, provided conceptual budget analysis which assisted in lease negotiations with the tenant. This included feasibility studies, market analysis, traffic flow patterns, municipal appeals, and zoning studies due to parking conflicts.
In addition, the owner was to spend approximately $500,000 to temporarily relocate existing tenants during the construction period. The McDonnel Group created a design which allowed the existing roof to remain thus eliminating the need for tenant relocation, resulting in substantial savings to the owner. This creative design involved installing a series of pitch pockets, adding stub columns, and adding a second floor over the existing roof. The cost of the overall project was reduced by eliminating the need for roof removal. This also resulted in costs savings due the elimination of temporary weather protection.
The McDonnel Group was solely responsible for the conceptual structural design, meeting the tenant’s prototype criteria, controlling architectural design, and bringing the mechanical and electrical trades into the project in a design-build capacity. The McDonnel Group obtained all governmental approvals, coordinated and distributed design-build packages throughout the various stages of design, and alleviated all owner interface issues with adjacent tenants while satisfying all owner and tenant expectations. As a result of this fast-track design-build approach, Bed Bath & Beyond was able to occupy this beautiful new 53,000 square foot store two months earlier than the specified contract time.



